Call (605) 600-6045Request a Quote
Rock riprap placed around a culvert outlet
Western SD & NE Wyoming

Creek, Stream Bank & Riprap Work in Western South Dakota

Creeks move. A high-water spring cuts into the outside of a bend, drops gravel and silt where it slows down, and piles up debris against culverts and fences. Black River Contracting cleans out creeks, repairs eroded stream banks and places riprap across Western South Dakota and Northeast Wyoming.

Most of this work is done with our Cat 324E long-reach excavator, which reaches the creek from the top of the bank so the machine stays out of the water.

What we do

  • Creek cleanout: digging out gravel bars, silt and debris that are pushing water into a bank, a road or a field.
  • Stream bank repair: shaping cut and slumping banks back to a stable slope.
  • Riprap installation: placing rock on eroding banks, at culvert outlets, below spillways and on dam faces, where moving water would otherwise keep cutting.

Before we start

Work in a creek is regulated more closely than work on dry ground. Digging in a creek or placing rock below its normal high-water line can need a permit from the U.S. Army Corps of Engineers, and sometimes state approval. Check with them first, and we’ll work to what the permit allows.

We walk the site with you to see where the machine can sit, how far it has to reach, where rock can be delivered and stockpiled, and what’s upstream and downstream of the work.

Common questions

Do I need a permit to work in a creek?
Often, yes. Digging in a creek or placing riprap below its normal high-water line can need a permit from the U.S. Army Corps of Engineers under Section 404 of the Clean Water Act, and sometimes state approval. Check before the work starts; we'll work to whatever the permit allows.
What is riprap?
Large, angular rock placed on a bank, a channel or around a culvert outlet to take the force of moving water so the soil underneath doesn't wash away. It's usually set on a shaped slope, often over filter fabric or a layer of smaller rock.
How much does riprap cost?
It depends on how much rock the job needs, the size of the rock, how far it's hauled, and how hard it is to reach and place. We look at the site and quote that job.
Why work from the bank?
A long-reach excavator can dig and place rock from the top of the bank, so the machine stays out of the water and off soft ground, and the bank isn't torn up getting a machine down to the creek.

Ready to break ground?

Every site is different. We'll walk it with you and give you a straight answer, with a clear scope and an honest estimate.